aaron-phaedra
Wednesday, December 10, 2008
welded/shaved ashtray and heater vents
shave the heater vents and ash tray
welded back together 2.5" shorter
shorten the steering column
welded in the bus
new floor
raised 2.5"
cut and raised 2.5"
raise the steering box
i'm gonna dump this bus so i need to raise the steering box so it doesn't scrape.
rotten rusted floor ripped out
color change, time to sand off the paint
this took me 3 months... it only takes 1 day on overhauling. huh?
project from hell
installed the safari windows.
Newer Posts
Home
Subscribe to:
Posts (Atom)